This project consisted of the demolition of 13 existing timber piles, and 130 timber floats. In addition, the installation of 13 steel piles, an 80’ gangway and 100’ of low profile floats, and beach cleanup of concrete debris for mitigation.
Crew Members left to right; Josh (Operator), Aaron (Superintendent), Travis, (Mechanic) John, (Pile Driving Foreman), Craig (Pile Driving Foreman) and Rob (Pile Driving apprentice)
Craig, Rob and John - Ãë²¥ Construction Crew Members